Type of event: construction
Regina Region:
Hwy 6 - 16.74 km south of Southey
Under Construction
Bridge under repair
2012-01-09 to 2012-04-13
Additional Info/ Detours
Hwy 6 - Bridge repair - Maximum width on the bridge is 4.9 m over the duration of the project.