Type of event: construction

Regina Region:
Hwy 6 - 16.74 km south of Southey

  • Under Construction

  • Bridge under repair
  • 2012-01-09 to 2012-04-13

  • Additional Info/ Detours

  • Hwy 6 - Bridge repair - Maximum width on the bridge is 4.9 m over the duration of the project.