Type of event: construction

Tisdale Region:
Hwy 23 - 2 km north of Jct Hwy 38 to 36 km south of South Jct Hwy 3


Reduced speed required, Surface breaks, Rough,
starting 2017-10-30

Additional Info/ Detours



Tisdale Region:
Hwy 3 - 3.6 km west of Tisdale to 32.6 km east of Melfort


Reduced speed required, Rough, Reduced speed limit in effect: 60km/h
to 2019-04-30

Additional Info/ Detours
ROUGH ROAD, slow to 60 km/h



Tisdale Region:
Hwy 6 - 3 km north of Melfort to 26 km south of Gronlid

Under Construction
Reduced speed required, Rough, Reduced speed limit in effect: 60km/h
to 2019-03-29

Additional Info/ Detours
speed restriction of 60km/hr, bump and rough road, temporary gravel surface over bridge deck



Tisdale Region:
Hwy 3 - 21.96 km west of Tisdale to 14.8 km east of Melfort


Reduced speed required, Rough, Reduced speed limit in effect: 60km/h
to 2019-04-30

Additional Info/ Detours
ROUGH ROAD slow to 60 km/h



Tisdale Region:
Hwy 3 - 0.7 km west of South Jct Hwy 23 to 20 km east of Tisdale

Under Construction
Watch for equipment and persons working, adjacent to road, Be prepared to stop, Reduced speed limit in effect: 60km/h
starting 2019-03-04

Additional Info/ Detours
Culvert boring adjacent to highway. Slow to 60 KPH. Traffic lights.



Tisdale Region:
Hwy 3 - 12 km west of Prairie River Access to 2.5 km east of Mistatim


Rough,
2019-02-27 to 2019-04-30

Additional Info/ Detours
Rough road. Caution log trucks will be going 65 km/h.



Tisdale Region:
Hwy 335 - Vicinity of Jct Hwy 35 to 30 km east of Gronlid


Be prepared to stop, Reduced speed limit in effect: 60km/h

Additional Info/ Detours
Foot traffic and parked vehicles in vicinity.



Tisdale Region:
Hwy 55 - 3 km north of Nipawin to 4 km south of North Jct Hwy 35

Under Construction
Bridge under repair, Reduced speed required, Rough, Be prepared to stop, Restricted lane width, Vehicle width limit in effect: 3.5m , Reduced speed limit in effect: 30km/h
2019-04-03 to 2019-07-31

Additional Info/ Detours
Bump and rough on bridge deck, reduced speed 30 km/hr, width restriction 3.5m. Only legal weight loads allowed until July 31, 2019.



Tisdale Region:
Hwy 255 - Jct Hwy 55 to 7.69 km south of Tobin Lake

Under Construction
Reduced speed required, Rough, Reduced speed limit in effect: 60km/h
2018-10-24 to 2019-04-30

Additional Info/ Detours
rough road



Tisdale Region:
Hwy 3 - Melfort to 11 km west of Kinistino

Under Construction
Sharp drop off pavement, Watch for equipment and persons working, adjacent to road, Flagpersons in attendance, Be prepared to stop, Maintenance to be performed in daylight hours only.
2019-03-06 to 2019-04-19

Additional Info/ Detours
Culvert installations - Boring culverts through the highway. Work adjacent to roadways, may need to use flaggers at times for crossing equipment



Prince Albert Region:
Hwy 20 - Jct Hwy 320 to 18.8 km south of Jct Hwy 3

Under Construction
Reduced speed required, Rough, Reduced speed limit in effect: 60km/h

Additional Info/ Detours
Gravel surface over new bridge. Slow to 60km



Prince Albert Region:
Hwy 25 - 0.1 km west of Jct Hwy 3 to 0.1 km east of Jct Hwy 2


Reduced speed required, Rough,

Additional Info/ Detours



Prince Albert Region:
Hwy 355 - 1.9 km west of Jct Hwy 2 to Sturgeon Lake Reserve

Under Construction
Bridge under repair, Reduced speed required, Rough, Watch for equipment and persons working, Be prepared to stop, Reduced speed limit in effect: 60km/h
2018-12-13 to 2019-01-22

Additional Info/ Detours
Traffic now travelling on bridge over Spruce River. Bridge awaiting pavement scheduled for this spring.