Type of event: construction

Swift Current Region:
Hwy 1 - 22.5 km west of Rush Lake to 4 km east of Swift Current

  • Under Construction

  • Local detour, Bridge out, Bridge under repair, Reduced speed required, Watch for equipment and persons working, Restricted lane width
  • Maintenance to be performed in daylight hours only, expect delays of under 20 minutes.
  • Vehicle width limit in effect: 4.3m
  • Reduced speed limit in effect: 60km/h

  • 2022-05-07 to 2022-10-31
  • Additional Info/ Detours

  • Eastbound Bridge will be closed to traffic, while the bridge is replaced. Traffic will accommodate by crossovers. Traffic will be slowed to 60 km/hr.