Type of event: construction

Prince Albert East Region:
Hwy 55 - Vicinity of Jct Hwy 123 to 27 km east of Nipawin

  • Under Construction

  • Reduced speed required, Rough, Heavily Rutted, Fresh oil, Loose stones, One lane traffic, Watch for equipment and persons working, adjacent to road, Flagpersons in attendance, Pilot vehicle in attendance, Be prepared to stop, Water on road
  • Maintenance to be performed in daylight hours only.
  • Reduced speed limit in effect: 60km/h

  • 2022-05-06 to 2022-10-15
  • Additional Info/ Detours

  • There will be very limited interference with the Traffic. Roadway surface Gravel for 100 metres. Through grade and bored culvert will be ongoing with construction