Type of event: construction

Yorkton Region:
Hwy 16 - 3 km north west of Springside to 38 km south east of Sheho

  • Under Construction

  • Bridge out, Bridge under repair, Reduced speed required, One lane traffic, Watch for equipment and persons working, adjacent to road, Flagpersons in attendance, Be prepared to stop
  • expect delays of 20 to 30 minutes.
  • Vehicle width limit in effect: 4.3m
  • Reduced speed limit in effect: 30km/h

  • 2017-10-10 to 2017-11-30
  • Additional Info/ Detours

  • Starting October 10th, Legal Weight Loads Only, construction of a one lane temporary detour will be constructed next to the existing bridge, which is being replaced. Once temporary detour is complete, this detour will have traffic signal lights to indicate when it is safe to proceed.