Type of event: construction

North Battleford Region:
Hwy 40 - Battleford to Wilbert

  • Under Construction

  • Impassable, Bridge out, Bridge under repair, Reduced speed required, Rough, One lane traffic, Watch for equipment and persons working, Flagpersons in attendance, Be prepared to stop, Restricted lane width
  • Maintenance to be performed in daylight hours only, expect delays of under 20 minutes.
  • Vehicle width limit in effect: 4.3m
  • Reduced speed limit in effect: 60km/h

  • 2017-02-14 to 2017-03-10
  • Additional Info/ Detours

  • Exact location: 19.6 kms East of Cut Knife. Traffic will be accommodated across a one-way detour bridge adjacent to the existing bridge. Bridge-rails are 940 mm high. Traffic lights will be set up in both directions and travelers should expect wait times of approximately 4 minutes. The posted speed limit through the work zone varies between 60 km/h and 20 km/h. Legal loads only.